| 2 Underground Metro Projects of ITD Cementation India Limited bags Silver Trophy at National Safety Council of India Safety Awards 2022. | Mumbai Metro & Kolkata Metro 2022 |
| For the first time in the history of Delhi Metro we have constructed an elevated track segment over another operational metro line, at a record height of 21 meters above the ground. | DMRC, Delhi 2014 |
| 37.5 m of tunneling in a day with installation of 25 rings using TBM | DMRC, Delhi 2009 An Asian Record |
| 1.7 Km long tunnel completion using TBM in 152 days | DMRC, Delhi 2009 |
| Installation of 211 driven cast in-situ piles in a single day at a site | Mundra, Kutch 2008 |
| Installation of more than 40 driven cast in-situ piles in a single day by a rig | Mundra, Kutch 2008 |
| Deep top hammer drilling in drainage gallery under 2m headroom | Sripada Yallampalli (A.P.) 2006 |
| 12.5 Km construction of diaphragm wall by a single agency | Sabarmati, Ahmedabad 2005 |
| First Shiplift Facility for Indian Navy | Sea Bird, Karwar 2005 |
| Ground Improvement by Vibro Compaction Technique | Sea Bird, Karwar 2003 |
| Marine Piling from both ends of Gantry | JNPT, Mumbai 2000 |
| Contiguous Precast Driven Pile | Haldia Port, WB 1999 |
| First Private sector Container Terminal | JNPT, Mumbai 1999 |
| Marine band drain from Spuded pontoon | Kakinada Port 1993 |
| Marine piling from Jack up platform | Tuticorin 1991 |
| Quick grout for sealing of heavy leaks | Kolkata 1985 |
| Heavy deadman anchors, using steel tie rod | Paradip 1984 |
| Jacking of Rectangular RCC boxes | Kolkata 1981 |
| Tube Heading Technique under Railway tracks | Kolkata 1977 |
| Jacked down steel piles | Kolkata 1976 |
| Pipe Jacking under Rail/Road embankments | Howrah 1971 |
| Sand wicks for accelerated soil consolidation | Kolkata 1968 |
| Control of underground subsidence | Kulti 1968 |
| Marine investigation from Jack-up-rigs | Chennai 1967 |
| Small dia bore piling | Bokaro Steel 1966 |
| Soil Densification by Vibroflot Method | Chennai 1961 |